This model illustrates logic to keep two out of three reliability components operating at any given time, while evening out the overall operating time among three machines. Each component includes four types of Preventive Maintenance (PM) schedules as well as random failure modes with auto-repair. PM can occur only when there are two operable machines.
Download the Model File:
Comments
2 comments
My purchased GoldSim and Reliability module is version 11, and of course will not open a version 12 file. Any way to get this and other models as version 11?
Hi Carl - Unfortunately, we don't have an 11.1 or earlier version of this model file. If you're interested, send a request into support@goldsim.com and I can create a Player version of this model. Then, you can download the latest Player for free and at least open the Player file to see the model implementation and run it.
Please sign in to leave a comment.