Hi All,
I have two ponds (Pond A and Pond B, each with a capacity of 10 L). These ponds are set up to run alternately depending on a defined volume (2 L). For example, I want Pond B to take inflow at a rate of 0.5 L/day until the water in Pond B reaches 2 L. At that point, Pond B will stop receiving any inflow and will start emptying at a rate of 0.1 L/day. While Pond B is emptying, Pond A will be online and receive an inflow at a rate of 0.5 L/day until the water in Pond A reaches 2 L. Then, Pond A will stop receiving any inflow and will start emptying at a rate of 0.1 L/day.
I can achieve this in Excel, but I am not sure how to do in goldsim,
Apologies in advance if my explanation does not really make sense.